Products and strategies used to reduce moisture related coating failures often installed before primers and body coats.
Vapor Barriers
RH Control
Blister Prevention
Foundation Layer
Vapor Barriers
RH Control
Blister Prevention
Foundation Layer
Scenarios where moisture mitigation is critical to coating system success.
Key questions to answer before specifying a moisture mitigation system

Relative humidity (ASTM F2170) and moisture vapor emission rate (ASTM F1869) readings determine if mitigation is required and which products are suitable for the measured levels.

Some moisture mitigation systems require longer cure times before overcoating. Fast track projects may need rapid set moisture barriers. Confirm the schedule accommodates the selected product.

Previously coated or contaminated slabs may limit moisture mitigation options. Surface preparation must remove existing materials and expose clean concrete for the barrier to bond.

The moisture barrier must be compatible with the primer, build coats, and topcoats that follow. Incompatible chemistries can cause delamination or cure inhibition.
Please wait while you are redirected to the right page...