Repair materials that make systems last longer used to rebuild, patch, and prep substrates before coatings or membranes.
Patch & Repair
Substrate Prep
Crack Filling
Leveling
Patch & Repair
Substrate Prep
Crack Filling
Leveling
Where It Fits
Primer Use
Best when: Installed before primer in most systems. Crack fillers and repair mortars are used to address substrate defects before applying primers and coating systems.
Watch out: Ensure repair materials are fully cured and compatible with the primer system. Some primers may not bond well to certain repair mortar chemistries.
Build and Body Coat Use
Best when: Used to rebuild and level before system coats. Repair mortars rebuild spalled areas, fill voids, and create a uniform surface profile for coating application.
Watch out: Depth and width of repairs affect cure time and shrinkage. Follow manufacturer specifications for maximum lift thickness and cure times before overcoating.
Topcoat Use
Best when: N/A. Crack fillers and repair mortars are substrate preparation materials, not decorative or protective finish layers.
Watch out: These materials must be covered by appropriate primers and coating systems. They are not designed to be left exposed as a final surface.
Common Applications
Crack fillers and repair mortars prepare substrates for coating and waterproofing systems.
Industrial Floor Prep
Waterproofing Detail Prep
Court Resurfacing Prep
Joint and Crack Repair
Selection Checklist
Key questions to answer before selecting crack fillers and repair mortars.
Moving cracks to Static cracks
Moving cracks require flexible repair materials or stress relief strategies. Static cracks can use rigid repair mortars. Identify crack type before selecting repair method.
Depth and width
Repair depth and width dictate material selection and application method. Deep repairs may require staged lifts; wide cracks may need backer rod or specialized fillers.
Return to service time
Fast cure repair mortars are available for tight schedules. Standard cementitious repairs may require 24-48 hours before priming. Match material to timeline.
Indoor and Outdoor
Outdoor repairs must withstand weathering, UV, and thermal cycling. Indoor repairs may prioritize low odor or fast cure properties for occupied spaces.